Elm Street at Potter Road Intersection Improvements
map thumbnail

Project Summary: The project includes the installation of new traffic signal along with related traffic and roadway improvements. The work include cold planning and overlay of roadway pavement, installation of conduit and other miscellaneous utility work, geometric improvements, sidewalk and wheelchair ramp construction, drainage modifications, installation of curbing, signing, and pavement marking.

Project Details:

Construction Project Updates Work scheduled for October includes cold planning the existing pavement surface, adjusting manholes and catchbasins, 1 ½” pavement overlay and the installation of pavement markings. The new ornamental traffic signals should be installed by the end of the year.

Construction Update Map Update Map

Framingham Engineering Division
(508) 532-6010

An on-call staff member carries a dedicated phone line for the residents of Framingham that can be called with any questions or concerns about ongoing projects. The staff member is responsive to calls between the hours of 7:00AM EST to 11:00PM EST, Monday through Friday. Messages left on voicemail will be responded to within 24 hours.
Administrator Logon
Return to Construction Home Page