Project Summary:
The project includes the installation of new traffic signal along with related traffic and roadway improvements. The work include cold planning and overlay of roadway pavement, installation of conduit and other miscellaneous utility work, geometric improvements, sidewalk and wheelchair ramp construction, drainage modifications, installation of curbing, signing, and pavement marking.
Project Details:
Work scheduled for October includes cold planning the existing pavement surface, adjusting manholes and catchbasins, 1 ½” pavement overlay and the installation of pavement markings. The new ornamental traffic signals should be installed by the end of the year.