Project Summary: Phase I of this project will run along State Street from High Street going in a southerly direction just past the student center and includes geometric improvements, roadway widening, pavement reconstruction, sidewalk construction/reconstruction, drainage improvements, water main and service upgrades, and streetscape improvements (brick- paver accent strips and crosswalks, two tabled intersections).

Project Details:

Construction Project Updates Through the month of October, the project should be near its completion. The western sidewalk it set to be poured during the first week of this month, and final lighting, brick paver inlay, and final top coat of hot mix asphalt should be done by the end of October.

Construction Update Map Update Map

Framingham Engineering Division
(508) 532-6010

An on-call staff member carries a dedicated phone line for the residents of Framingham that can be called with any questions or concerns about ongoing projects. The staff member is responsive to calls between the hours of 7:00AM EST to 11:00PM EST, Monday through Friday. Messages left on voicemail will be responded to within 24 hours.
Administrator Logon
Return to Construction Home Page